Welcome to TechNet Blogs Sign in | Join | Help

Browse by Tags

All Tags » DTS   (RSS)
Sorry, but there are no more tags available to filter with.

How to identify which DTS Package is being called by scheduled job

I have seen where DBAs would right click the DTS Package (SQL 2000) and schedule a job. If you schedule a package to run that way, the SQL Job it creates will have an encrypted name for DTS package in SQL job step - similar to what you see below: DTSRun
Posted by vishah | 0 Comments
Filed under:
 
Page view tracker